As BC transitions rapidly toward electrification—electric vehicles (EVs), heat pumps, and electric domestic hot water systems—the demand on building electrical infrastructure is growing fast. Many strata corporations are finding themselves underpowered and underprepared.
That’s why the BC Government now requires Electrical Planning Reports (EPRs) for all strata corporations with five or more units. At Phase Technologies, we specialize in helping strata councils understand, evaluate, and future-proof their electrical systems.
What Is an Electrical Planning Report (EPR)?
An Electrical Planning Report is a detailed technical document that:
Assesses your existing electrical capacity
Analyzes peak demand and spare capacity
Projects future load requirements, including for:
EV charging stations
Heat pump systems
Domestic hot water conversion
Lighting, ventilation, and other mechanical systems
Recommends load management strategies and/or upgrades
These reports provide the foundation for responsible decision-making, EV charger approvals, and budget planning.
Deadlines for Strata Corporations
If your strata has 5 or more strata lots, BC regulations require you to obtain an EPR by:
December 31, 2026 – Metro Vancouver, Fraser Valley, and CRD (excluding remote islands)
December 31, 2028 – Other BC regions
New strata plans – Within 5 years of registration
Why Work With Phase Technologies?
At Phase Technologies, we are licensed professionals with engineering credentials and a strong track record in:
Multi-unit residential electrical assessments
EV charger infrastructure planning
Load management and energy efficiency solutions
Compliance with the BC Strata Property Regulation
Our team brings clear communication, detailed technical reporting, and actionable recommendations that serve both current council needs and long-term asset planning.
We help you:
Avoid brownouts and overloaded systems
Evaluate capacity for future EV charger installations
Estimate upgrade costs and timeline
Access BC Hydro data and complete Form B disclosures
What’s Included in an EPR From Phase Technologies?
Our reports follow and exceed the BC Government’s 2025 EPR guideline. We include:
Site inspection and electrical system description
Capacity analysis: main service, common areas, and suite panels
Identification of current loads and peak demand
Projected loads for EV chargers and electrification initiatives
Cost-saving load reduction strategies (e.g., LED retrofits, heat pump upgrades)
High-level upgrade paths and feasibility for increased capacity
Want to Go Further? Ask Us About:
EV Ready Plans – Bring your parking infrastructure up to EV-ready standard
Retrofit Opportunity Assessments – Tap into CleanBC funding and modernize your building
Ready to Future-Proof Your Strata?
Contact Phase Technologies Inc. today to schedule your Electrical Planning Report.
📞 (778-715-8881)
Let’s work together to ensure your building is ready for the future of energy.
“Our goal is to help your building transition smoothly into the electrified future—while saving money and avoiding electrical system surprises.”
— Phase Technologies Inc.
_edited.jpg)

Comments