
WHAT IS EV READY REPORT?
An EV Ready Plan outlines a strategy that provides a minimum of one EV Ready parking space per residential unit. This helps ensureMulti-Use Residential Buildings have an approach to make their building future proofed to provide all residents with a simple process to access EV charging at their parking space.
​
HOW DOES IT WORK?
EV Ready means a parking space is equipped with an electrical wiring termination point designed to support Level 2 Electric Vehicle Supply Equipment (EVSE). This termination point must be within 5 meters of any part of the designated parking stall or the intended EVSE installation site.Most EV Ready designs use a junction box for termination, as they often integrate EV Energy Management Systems and load-sharing technology. Alternatively, an electric receptacle may be used if the system is configured with a dedicated circuit.
HOW MUCH DOES IT COST?
The EV Ready Plan itself can cost up to $5,000, but many plans range from $3,000 to $5,000 plus GST.
​
ARE THERE ANY REBATES?
YES,BC Hydro offers a rebate covering up to 75% of the plan's cost, up to a maximum of $3,000. Contact us and we will help you to get the rebate.
Get a Quote
Thank you for getting in touch with Phase Technologies Inc., We will get back to you soon.
_edited.jpg)



